FleetLearn
Reading module
Slide 1 of 7

Obtain the Task Card

  • When assigned a Task, obtain the Task Card from Veryon or the Maintenance Manual.
  • Complete the task as required.
Intermediate
Scheduled Maintenance
Veryon
Logbook
AML

Scheduled Maintenance SOP — Veryon

How to document a scheduled maintenance task in Veryon — obtaining the Task Card, adding compliance for a changed part (Parent vs. Child cards, Reason Removed, Installed Status), completing Task Card compliance, creating the logbook entry, the AML entry wording ('C/W scheduled Mx, see OSAS WO.'), and sending the RTS package to maintcontrol@priesterav.com.

0 viewsOct 8, 2026Read & Quiz

Systems & tools used

  • Veryon (Maintenance Item, Task Cards, Logbooks)
  • Aircraft Maintenance Logbook (AML)
  • Quantum MX (Work Order)
  • Scanner / PDF

SOP & compliance notes

  • When changing an item like a MLG wheel/tire assembly, select the Parent Card so Child cards open automatically
  • If you have multiple types of logbook entries, make separate logbooks for each type